Northwest Park

Services provided:

  • Served as civil engineering & surveying sub consultant to Mullis Design Group Landscape Architects for 5-acre park site
  • Conducted boundary & topographic surveys
  • Site is an old spoil area created during construction of the adjacent subdivision
    • Significant soil-related and topographic challenges were overcome during the design
  • Park program includes picnic shelter, playground, play field, walking trail loop with exercise stations, and parking lot
  • Designed several innovative stormwater solutions:
    • Permeable pavement parking lot and permeable playground were designed as BMP’s
    • Disconnected impervious strategy employed to treat runoff from asphalt walking trail loop
    • Cistern utilized to capture portion of shelter roof and use for irrigation (detailed cistern design by MDG)
  • Designed water and sewer services
  • Services included construction documents, cost estimating, permitting, and construction admin
  • Park opened in July 2016
  • Park was awarded the 2017 EPA Region 4 Rain Catcher Award for the innovative stormwater solutions employed