Northwest Park
Services provided:
- Served as civil engineering & surveying sub consultant to Mullis Design Group Landscape Architects for 5-acre park site
- Conducted boundary & topographic surveys
- Site is an old spoil area created during construction of the adjacent subdivision
- Significant soil-related and topographic challenges were overcome during the design
- Park program includes picnic shelter, playground, play field, walking trail loop with exercise stations, and parking lot
- Designed several innovative stormwater solutions:
- Permeable pavement parking lot and permeable playground were designed as BMP’s
- Disconnected impervious strategy employed to treat runoff from asphalt walking trail loop
- Cistern utilized to capture portion of shelter roof and use for irrigation (detailed cistern design by MDG)
- Designed water and sewer services
- Services included construction documents, cost estimating, permitting, and construction admin
- Park opened in July 2016
- Park was awarded the 2017 EPA Region 4 Rain Catcher Award for the innovative stormwater solutions employed