Renewable Energy: Solar

One common challenge with solar farm projects is the need to accurately identify the total amount of land disturbance that will be required for the project as early in the process as possible. The limit of disturbance (or LOD) must account for all land area that will be needed for the solar panels and internal access aisles, perimeter access roads, fencing, equipment, sediment basins/stormwater control measures, spoil areas, and substations. Since most solar farm projects include a tight timeframe and sitework permitting must be obtained as early in the process as possible, it is critical to understand these parameters and nail down the LOD as early as possible. Ballentine Associates has an extensive track record of successful solar farm design and permitting.

Contact Us.

Start A Conversation With Our Team.

Supporting projects that move forward smoothly. We think like developers, helping identify potential risks before they stall your timeline and burn through cash.

A trusted partner dedicated to personal service
Surveying and planning that help eliminate rework
45+ years adding measurable value