Project overview:
- 3.5 MW AC fixed-tilt ground mounted system over 22 acres
- Produces enough clean energy to power approximately 700 homes
- Construction took approximately 6 months
Services provided:
- Drew construction drawings:
- Construction drawings detailed access, drainage and soil and erosion control
- Provided 5 full sediment basin designs as part of the sites erosion control package
- Drawings identified temporary construction and permanent driveway entrances
- Stormwater Management plan designed to meet Durham County Stormwater Ordinance – stormwater wetland and two permanent dry detention ponds required
- Obtained approvals & conducted permitting:
- Site plan – Durham city/county planning
- Land Disturbance Permits – Durham County
- Driveway permit – NCDOT
- Stormwater Permit – Durham County
- Provided construction administration:
- Performed periodic field visits during construction to ensure compliance with the approved plans
- Drew stormwater wetland/dry detention pond as-built drawing