Monroe Solar Farm
Project Owner: Duke Energy
Contact: Brent Niemann, P.E., Strata Solar
Project overview:
- At completion, was third largest of Duke’s solar farms in North Carolina
- 60 MW AC fixed-tilt ground mounted system with approximately 785,000 solar panels over 400 acres
- Produces enough clean energy to power approximately 12,000 homes annually
- Construction took approximately 6 months
Services provided:
- Created construction drawings:
- Prepared construction drawings detailing access, drainage and soil erosion control
- 36 sediment basin required for erosion control
- 2 temporary construction and permanent driveway entrances
- Jurisdictional impact designs for 2 stream crossings and a wetland crossing
- Conducted permitting:
- Land Disturbance Permits, NC DEMLR, Environmental Quality
- 3 driveway permits (2 permanent permits and one temporary permit), NCDOT
- Stormwater/TRC Permit-Union County
- Assisted with 401/404 jurisdictional impact permits, USACE/NCDEQ
- Provided construction administration:
- Conducted periodic field visits during construction to ensure compliance with the approved plans